Author
Sarmidi -(1
(1) ,
| Article Analytic |
Available online: 2017-01-26 | Published : 2017-01-26
Copyright (c) 2017 Sarmidi -
Article can trace at:
Article Metrics
Abstract Views: 171 times
PDF Downloaded: 0 times
Abstract
With increasing power consumption, the reliability of the electricity system needs it's own, especially on electrical power systems. Electrical equipment installed in the substation should be monitored for 24 hours by the operator and junior engineering assistant in each of the substation so that the reliability of the operating system reliability is maintained. To minimize disruption as early as may be required continuous monitoring equipment and the availability of equipment engineering data quickly and accurately, if at any time will be needed.
in this case the writer intends to make a program / application that is able to facilitate the work of engineering data and data storage equipment in GITET TASIKMALAYA disorders with a better system and data processing dihasilkanpun be more accurate than the previous system were assessed to be less accurate and less orderly good.
Keyword : GIGET, Facilitate, Engineering
Refbacks
- There are currently no refbacks.

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.



